Testimonial

  • "Vision Interior Projects have been our preferred refurbishment company for 8 years, we don't feel the need to change that as the team understands our needs and provides us with an excellent service.

    The whole team provide good friendly service at a competitive price and a good standard."

    Jamie Tucker COFELY
  • “Over the past 4 years Vision Interior Projects have built up a good working relationship with Carillion Projects Division, understand and accommodate the ever-changing project environment and have always provided excellent service, quality and value for money."

    Mr Jeff Cooper Carillion Planned Maintenance
  • "Vision Interior Projects (UK) Ltd have, during the past few years, carried out refurbishment and planned maintenance contracts to a varied portfolio of British Red Cross properties within the South East and London Territory. They have done so in a most professional and caring manner both to time and budget. I have no hesitation in recommending this company to any prospective clients."

    Chris Harmes, Territory Building Surveyor - SE British Red Cross
  • “I have used  Vision Interior Projects over the last 10 years for both large and small projects. They have always proved to be quick to respond with visits to locations, advise on works required and supply quotes which are competitive. Quality of work is good, staff are courteous and tidy when working"

    Alan Brain CB Richard Ellis Ltd.
  • "I just wanted to let you know how pleased I am with the standard of craftsmanship your contractors displayed on the fitting out of the cladding on the boathouse wall at the rear of the Hovercraft bay. Not only did they retro –fit the cladding, they also gave our internal doors a fresh coat of paint and their work has really made the place shine. Keeping these surfaces clean is going to be a lot easier and this area is often the first thing visitors see so this is very important to us. Please pass on our thanks to Gary & Steve of Vision Interior Projects Ltd for a great job well done."

    Lifeboat Operations Manager RNLI Southend

Gaffney Cline & Associate’s- Bentley Hall

Bentley Hall is situated in Blacknest near Alton and is the UK headquarters of Gaffney Cline & Associate’s, it consists of the main house with a link corridor to the technical building and also boasts a third building called the North block, with three other outbuildings on the site.

Our client FES FM contacted us to see if we would be in a position to tender for the external repairs works late last July to which we accepted and subsequently won the tender.

Works commenced in September to the North block roof to which we first had to remove approx. ten ton moss which had built up over the years, once removed the moss we then re felted the parapet walls, fitted a new hand rail to the perimeter of the building complete with access ladder and layed new UV stone to the roof.

The plant room also required some repairs as the roof was leaking and after investigation it was found that the ridge flashings were damaged, we replaced the flashing with new ones, checked the rest of the roof and the plant room is now water tight.

Asbestos was issue to us as the asbestos register showed us we were dealing with and asbestos soffit to outbuilding four and this would prove expensive to remove, with that in mind we were able to encapsulate the soffit with a new Upvc soffit with warning signs to each elevation advising that the soffit did contain Asbestos.

Our item which proves to the more demanding was the fact that the pebble dash render to the chimney stacks were blown and falling away in places. After erecting our scaffold and getting a closer look at the damage we soon realised that some 2om2 to 25m2 would need to be removed, new beading installed and new render applied, this applied to all six chimney stacks which varied in size from 5m wide x 2m deep to 12m high.

Whilst we had the scaffold in place we also replaced the flaunching to the stacks, checked all the cowls, pots and made sure the caps were securely in place.

Once the render had dried some three to four coats of Paint were applied to each stack before the scaffold was striked.

Final job was to remove the badly corroded external spiral staircase and leave the area ready to receive the new spiral staircase, this involved breaking down the existing staircase, break out existing footing as we could not be sure of it make up and laying a new concrete footing for the new staircase.

All works were completed in April with the exception of the installation of the new staircase due to delays in manufacture, the staircase will be installed in early May and pictures will be featured within our next newsletter.

Works completed by Vision Interior Projects included

  • Supply and install new Hand rail & access ladder.
  • Repairs to parapet wall felt.
  • Repairs to the existing render walls.
  • Repairs to the render on the chimney stacks.
  • Encapsulation of Asbestos soffits.
  • Check and clean all gutters, down pipes, gullies and brackets and replace with new where to badly damage.
  • Decoration to all six chimney stacks.
  • Replace broken roof & ridge tiles with new.
  • Supply and install new external spiral stair case.

 